COMPLETED OFFSHORE PROJECTS

Gode Wind 1,2

Gode Wind 1,2

Gode 1 & 2 consist of a total of 97 Siemens SWT-6.0-154 turbines generating up to 582 MW. The projects were officially commissioned in June 2017.

Wikinger

WIKINGER

At the end of 2018 Wikinger was inaugurated and now it supplies 350 megawatts (MW) of power to the German power grid and provides efficient renewable energy to 350,000 homes.

Borwin Gamma

Borwin Gamma

When operational, the 900MW BorWin3 HVDC platform will convert the alternating current produced by offshore wind turbines to direct current before transmitting it onshore to the German national grid via a 160-kilometre cable link.

HKZ Alpha

HKZ Alpha

HKZ Alpha is one of the two 700 MW offshore substations that TenneT ordered at Petrofac and that will connect the 1.5 GW Hollandse Kust Zuid offshore wind farm to the Dutch grid.

If you need to commission and handover your systems, or assure quality acceptance of such, then do not hesitate to contact me to discuss any cooperation opportunities. Whether you need one or a team of dedicated engineers to take care of your installation, completion, commissioning or other needs, please get in touch today.